Warning
  • JUser: :_load: Unable to load user with ID: 222

From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Green giant

Bank of America Tower, to be located at One Bryant Park in midtown Manhattan is a US$1 billion project that has been designed to be one of the most highly efficient and ecologically friendly tall buildings in the world. The building, currently under construction, is expected to be complete in 2008.

Jason Walsh got in touch with Cook + Fox Architects in New York, designers of the Bank of America Tower to see how the practice plans to square the circle of designing an environmentally sound high-rise building.

Ireland's inevitable default

Ireland's inevitable default
Richard Douthwaite explains why the bailout may turn out to be a gift to Ireland, and offers some advice for dealing with a default.

Critical mass

Critical Mass
Thermal mass can significantly influence a building’s space heating requirement – in some cases the effect is to increase it, and in others to reduce it. Leading energy consultant Ciaran King of Emerald Energy explains how this occurs, and by describing an assessment of the topic, provides some rules of thumb regarding when thermal mass may be beneficial, and when it may be detrimental.

Sustainability in store

IKEA
Little did we know when campaigning for the Fingal energy standard in 2005-06 that Construct Ireland would have a direct impact on Ikea’s first Irish store. Driven by a combination of Fingal’s requirements and their own renewable energy policy, the Swedish retail giant has invested in the largest ground source heat pump installation in Ireland and the UK, along with a well-thought biomass system fed by an onsite waste stream and a host of other green measures, as John Hearne reports

Solar Decathlon

Solar Decathlon
Lenny Antonelli takes a look at some of the entrants of the 2009 Solar Decathlon, a competition that challenges university teams from around the world to design and build homes that capture the sun’s energy.

Passive reaches new heights at UCD student halls

The winner of the sustainability award at the 2011 Irish Architecture awards, Roebuck Castle student residence at UCD’s Belfield campus is also the biggest certified passive house project built to date in Ireland and the UK. Tony Rigg of Kavanagh Tuite Architects explains how such a significant building achieved passive results.

Ecology of Scale

O310-EcologyOfScaleTITLE.jpg
As reported in the previous edition of Construct Ireland, South Dublin County Council is planning the development of an eco-district at Clonburris, on a scale and standard to rival even the best international examples. Fionnuala Lennon, Senior executive planner with South Dublin County Council and project manager of the Clonburris project sheds light on the groundbreaking plans which may prove pivotal in the drive towards a sustainable Ireland.

Civic Pride

0303-araschilldaratitle.jpg
Intended as a landmark not only architecturally, Áras Chill Dara sets an example for large scale sustainable building, as Construct Ireland’s Jason Walsh found out.

Q&A: Eaga

Ci asks EAGA
Energy upgrade specialists Eaga are responsible for technical training on SEAI’s Home Energy Saving scheme. Eaga technical manager Paul Wilson answers some key technical questions on the installation of boilers and heating arising from the recent contractor training.

Coillte Teoranta

0208coilltetitle.jpg
The building is the first all timber office complex in Ireland. It covers almost 2,300m2 of floor space and provides accommodation for almost 100 staff working in a wide range of forestry related disciplines.