EPA

‘‘We have a body of extremely experienced and competent staff who will be able to hit the ground running”

‘‘We have a body of extremely experienced and competent staff who will be able to hit the ground running”

SEAI recently proposed a series of changes to Deap — the software tool used to calculate BERs — including a reduction in its primary energy factor. But while this will benefit electrically-powered heating devices, some in the industry still feel systems such as heat pumps are disadvantaged by Deap and the BER system

Public private partnership schemes have come to dominate many aspects of Irish infrastructural development, from toll roads to urban regeneration schemes. Jason Walsh asks if they amount to privatisation by stealth and whether they come at too high a social and environmental cost.
Construct Ireland investigates what measures the Irish government is undertaking to actively encourage the homeowner to switch to non-polluting renewable energy sources.

Due to the ill-considered productivity of the house building industry towards the tail end of the economic boom, Ireland is now saddled with hundreds of thousands of vacant homes in various states of completion. Structural engineer Sadhbh Ní Hógáin, currently writing her thesis for a masters architectural degree in advanced environmental and energy studies at the Centre for Alternative Technology, looks at the options Ireland has to address the problem.
Jeff Colley spoke to Commissioner Piebalgs about key issues affecting Ireland’s energy future and the importance of local initiatives such as Fingal County Council’s groundbreaking introduction of sustainable building requirements
BRENDAN HOWLIN, T.D., Minister for the Environment (1994-1997) reflects on the blueprints, policies, and commitments that emerged from the Rio Earth Summit and looks at how far we have progressed since

Ireland has been waiting for a green procurement plan in the public sector for two years. Jason Walsh looks at what the plan should include and why it is needed, now more than ever, and with sustainable building at its core.

The unprecedented development seen in Ireland in the Celtic Tiger years was fueled by the availability of cheap, abundant fossil energy. As the boom ends, the state is attempting to boost the economy with investment in larger than ever infrastructural projects which will not benefit many of the tax payers who are funding them, and crucially don’t recognize the extent to which peak oil production will affect their viability, as Richard Douthwaite reveals.

In light of the failure of AER 5 and the widespread pessimism in the wind industry regarding converting AER 6 contracts into operating wind farms, we asked the six main political parties what their proposals are for the development of an Irish wind industry.