From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Breaking the mould - part V

In this fifth & final article in the series, Joseph Little compares simulations of several internal insulation options on common wall types, with worrying conclusions.

Sustainable Sligo



In issue 2 we reported on an innovative new energy bike scheme being implemented in Sligo. Its instigator, Wilhelm Bodewigs, got in touch to tell us about an interesting Tram system proposal for the county

Does old mean cold?

Balancing conservation and energy conservation in historic buildings
Historic buildings are all too easy to ignore when considering potential candidates for energy upgrade work. The heritage value of an historic building can often mitigate against the most obvious interventions, such as adding some form of wall insulation or replacing windows. Architect Fergal McGirl takes a typical Georgian building in Dublin through the energy rating process and proposes some considered upgrade measures. 

Capital L

Capital L
With the goal of achieving zero carbon standards for new homes by as soon as 2013, environment minister John Gormley has committed to introducing 60 per cent energy and carbon reductions under changes to part L of the building regulations next year. John Hearne spoke to leading industry figures to find out how the revised regulation could raise standards for both new and existing homes.

Dublin Docklands

0503-DOCKLANDS-SMALL.jpg
Number Two Grand Canal Square office, completed in September 2009 and substantially occupied by law firm Byrne Wallace in August this year, set a landmark in commercial office development by combining world-class design with sustainability - reconciling the architecture of Daniel Libeskind with achieving both a Breeam Excellent rating and an A3 BER certificate. Paul Dunne, sustainability and M&E director for Arup, outlines some of the project’s history and its achievements

Coastal cottage reborn

Coastal cottage reborn as zero energy home
Any building, no matter how cold and draughty, no matter how remote, can be improved to world-class energy performance, as an upgraded and extended Donegal cottage dating back to the 1800s proves.

Renewable Energy Grants

Renewable Energy Grants
As oil prices surge and the need to rapidly switch to energy sources that are secure and environmentally friendly becomes increasingly apparent, more and more Irish people are tapping into the renewable energy resources at their disposal. But are the Government giving people the incentive to make the switch?

Greening public procurement

Greening public procurement
Ireland has been waiting for a green procurement plan in the public sector for two years. Jason Walsh looks at what the plan should include and why it is needed, now more than ever, and with sustainable building at its core.

Rathdrum passive refurb

Rathdrum Passive Refurb
Randy Ralston and Mel Cronin aimed for the passive house standard with their upgrade, and though they didn’t quite get there they ended up with a house that produces more energy than it consumes, making it one of the country’s flagship green renovation projects.

Green giant

Bank of America Tower, to be located at One Bryant Park in midtown Manhattan is a US$1 billion project that has been designed to be one of the most highly efficient and ecologically friendly tall buildings in the world. The building, currently under construction, is expected to be complete in 2008.

Jason Walsh got in touch with Cook + Fox Architects in New York, designers of the Bank of America Tower to see how the practice plans to square the circle of designing an environmentally sound high-rise building.