From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

Heat of the Moment

Heating Technologies Explained
John Hearne spoke to a number of independent energy experts to develop an impartial view of the main sustainable heating options.

Murky Water

Waste Water
One thing householders don't want to fail is their wastewater treatment system – the pollution, the health hazard, the cost and not least the embarrassment factor are all potentially serious. And yet, one wastewater treatment system provider says that such failures are very likely. As Jason Walsh asks, is he right?

Good form

0404-Good-Form-SMALL.jpg
If you are at all worried about keeping construction costs down and lengthening the useable lifespan of your building, it’s critical that energy performance is considered from the earliest stages of planning and design. John Hearne spoke to a number of leading Irish experts in sustainable design about following simple principles of orientation, form and layout to achieve substantial energy improvements for free

Bio Logic

Protecting occupant health with building biology
Stricter air-tightness standards might be helping to reduce energy use in new build, but is it leading to higher indoor concentrations of chemical and biological toxins? Lenny Antonelli investigates an emerging approach to building that is combining attention to environmental impact with consideration for the potential health effects of modern building materials and practices.

Breaking the mould - part I

Ill-considered attempts to upgrade a building’s thermal performance can not only fail to save energy, but can also create serious problems for occupant health and building structure alike. Leading green designer Joseph Little of Joseph Little Architects investigates the particular problems associated with dry-lining single-leaf concrete block walls

Daintree

0211daintreetitle.jpg
The Daintree Building is a mixed-use, sustainable urban building on Pleasant’s Place, just off Camden St. Dublin , writes Brian O’Brien of Solearth Architects. Conceived in 1999 it has been a long development process—but by late September Daintree should be open for business and the ever innovative Daintree (Paper Co) Ltd will have a new home, one appropriate to the delightfulness of their products and their focus on nature’s generosity for their raw materials.

Coillte Teoranta

0208coilltetitle.jpg
The building is the first all timber office complex in Ireland. It covers almost 2,300m2 of floor space and provides accommodation for almost 100 staff working in a wide range of forestry related disciplines.

Modernist mountain house does passive with style

In the hands of the right architect, meeting the passive house standard needn’t involve compromising on design. Construct Ireland visited a recently certified passive house which shows that a seamless low energy architecture is possible

Seal of Approval (John Corless)

0212airtighttitle.jpg
As fossil fuel prices rise, the need for energy efficiency in achieving both is increasingly leading Irish people to an approach which combines both ventilation and heating,

King of the castle stars

Ireland's largest passive house development to date, Shanganagh Castle, is proof that with proper planning and collaboration, delivering high density housing doesn’t mean compromising on quality or climate action – without increasing costs or causing delays.