Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!


Designing a low energy building when you've got unlimited space is one thing – but what if you need to make your walls thin to maximise space on a small site in an architectural conservation area? Lenny Antonelli visited a new St Vincent De Paul sheltered housing project that fit a lot of sustainable features on to a small plot in Dublin's north inner city.

On Tuesday the 15th of March a passive house, a house that does not need to be heated, was built a few miles outside of Galway. The brain child of Lars Pettersson of Galway based Scandinavian Homes Ltd, it is believed to be the world’s first standardized and factory made passive house.

Geothermal heating is being specified by everyone from self-builders to developers to local authorities in increasing frequency across Ireland. As a relatively new technology in Ireland, it is crucial that anyone considering a geothermal system knows what they are getting into, to ensure an efficient, reliable heating source.
With over 20 years experience in this field in Ireland, Dr Paul Sikora, Vice Chairman of the Geothermal Association of Ireland explains what issues to be aware of when considering geothermal, from site suitability, to what to look for from suppliers and installers.


Walter P. Toolan and Sons, a firm of solicitors in Ballinamore, County Leitrim has redeveloped its office with the intention of creating a healthy, environmentally sound building. Jason Walsh visited the office to find out more.


Planning ahead for Ireland’s electricity supply is by no means a simple matter, given the range of unprecedented issues that are coming to the fore. Massive cuts in emissions must be achieved, whilst decisive action is required to ensure adequate supply of electricity at a time when usage is spiraling. Richard Douthwaite explains the balance that Ireland must achieve between efficient local generation and usage and ensuring optimal interconnection to global renewable electricity supply